massoutage

County annual report · FIPS 47111

2024 Macon County, TN Power Outage Report

In 2024, customers in Macon County, TN went without power for an average of 5.9 hours, a total of 81K customer-hours (Tennessee average 4.8 hours). That ranks 25th worst of 84 Tennessee counties and 1438th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
5.9
13,771 customers
Customer-hours out
81K
Peak customers out
7,596
Outages ≥1,000 out
19
0 of 10,000+ · 465 total
Longest outage
16h 15m
began May 9, 2024
Rank in state
25th/84
1438th of 2,990 US

Compared with TN, the US and 2023

Macon County, TN average hours without power per customer compared with state and national averages, 2024Macon County 5.9 hours, Tennessee average 4.8 hours, US average 12.6 hours, Macon County, 2023 7.4 hoursMacon CountyMacon County5.9hTennessee averageTennessee average4.8hUS averageUS average12.6hMacon County, 2023Macon County, 20237.4h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Macon County, TN customer-hours without power by month, 2024Jan 8,188, Feb 8,053, Mar 3,111, Apr 2,688, May 25K, Jun 5,748, Jul 9,204, Aug 4,341, Sep 6,547, Oct 6,598, Nov 492, Dec 1,022010k20k30k8,188Jan8,053Feb3,111Mar2,688Apr25KMay5,748Jun9,204Jul4,341Aug6,547Sep6,598Oct492Nov1,022Dec
Use the arrow keys to read values.
Customer-hours; May was the worst month.

Macon County year over year

CSVJSON
Macon County, TN: average hours without power per customer by year2015: 2.9h; 2016: 7.3h; 2017: 5.9h; 2018: 7.8h, coverage 55%; 2019: 7.8h, coverage 73%; 2020: 2.5h, coverage 73%; 2021: 5.3h, coverage 73%; 2022: 10.1h, coverage 75%; 2023: 7.4h; 2024: 5.9h; 2025: 7.2h0510150%50%100%2.9h20157.3h20165.9h20177.8h20187.8h20192.5h20205.3h202110.1h20227.4h20235.9h20247.2h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Tennessee customers tracked each year.

Biggest outages in Macon County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1July 28, 2024 05:15July 28, 2024 05:3015m7,5961,899
2October 26, 2024 01:45October 26, 2024 03:151h 30m4,9532,482
3May 9, 2024 07:00May 9, 2024 23:1516h 15m4,52811K
4October 11, 2024 13:00October 11, 2024 16:303h 30m2,9631,488
5February 13, 2024 03:00February 13, 2024 06:303h 30m1,9724,024
6March 19, 2024 14:30March 19, 2024 15:451h 15m1,817909
7February 19, 2024 14:30February 19, 2024 16:302h1,813457
8July 8, 2024 12:45July 8, 2024 13:1530m1,812457
9May 22, 2024 21:00May 23, 2024 09:1512h 15m1,7615,371
10May 26, 2024 15:30May 27, 2024 05:4514h 15m1,4513,273

Outage episodes by size in 2024: 65 reached 100+ customers, 19 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Macon County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Tri-County Elec Member Corp (TN)20246.4 hrs3.964.0 hrs3.19
Upper Cumberland E M C20224.3 hrs-2.2 hrs-

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Tennessee's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 13,771 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Macon County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Macon County, TN annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/tennessee/macon-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON