massoutage

County annual report · FIPS 32001

2024 Churchill County, NV Power Outage Report

In 2024, customers in Churchill County, NV went without power for an average of 2.6 hours, a total of 32K customer-hours (Nevada average 2.7 hours). That ranks 11th worst of 15 Nevada counties and 2217th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
2.6
12,212 customers
Customer-hours out
32K
Peak customers out
4,144
Outages ≥1,000 out
3
0 of 10,000+ · 284 total
Longest outage
23h 45m
began July 19, 2024
Rank in state
11th/15
2217th of 2,990 US

Compared with NV, the US and 2023

Churchill County, NV average hours without power per customer compared with state and national averages, 2024Churchill County 2.6 hours, Nevada average 2.7 hours, US average 12.6 hours, Churchill County, 2023 3.4 hoursChurchill CountyChurchill County2.6hNevada averageNevada average2.7hUS averageUS average12.6hChurchill County, 2023Churchill County, 20…3.4h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Churchill County, NV customer-hours without power by month, 2024Jan 585, Feb 1,414, Mar 4,171, Apr 1,040, May 961, Jun 5,452, Jul 9,024, Aug 698, Sep 6,724, Oct 863, Nov 705, Dec 29602.5k5k7.5k10k585Jan1,414Feb4,171Mar1,040Apr961May5,452Jun9,024Jul698Aug6,724Sep863Oct705Nov296Dec
Use the arrow keys to read values.
Customer-hours; July was the worst month.

Churchill County year over year

CSVJSON
Churchill County, NV: average hours without power per customer by year2015: 0.9h; 2016: 3.6h; 2017: 1.1h; 2018: 1.0h, coverage 95%; 2019: 3.2h, coverage 95%; 2020: 1.7h, coverage 96%; 2021: 3.6h, coverage 97%; 2022: 1.4h, coverage 97%; 2023: 3.4h; 2024: 2.6h; 2025: 5.8h02460%50%100%0.9h20153.6h20161.1h20171.0h20183.2h20191.7h20203.6h20211.4h20223.4h20232.6h20245.8h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Nevada customers tracked each year.

Biggest outages in Churchill County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1July 24, 2024 01:15July 24, 2024 09:458h 30m4,1447,620
2March 26, 2024 10:45March 26, 2024 12:151h 30m4,0783,873
3September 19, 2024 05:45September 19, 2024 19:0013h 15m3,6176,510
4June 13, 2024 22:00June 14, 2024 05:157h 15m963598
5June 7, 2024 06:15June 7, 2024 11:305h 15m6603,465
6April 13, 2024 20:00April 14, 2024 02:156h 15m568632
7May 4, 2024 23:30May 5, 2024 05:155h 45m401817
8July 14, 2024 21:00July 15, 2024 07:1510h 15m3961,166
9October 28, 2024 14:15October 28, 2024 16:302h 15m218335
10November 24, 2024 15:00November 24, 2024 18:153h 15m155374

Outage episodes by size in 2024: 15 reached 100+ customers, 3 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Churchill County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Sierra Pacific Power Co20246.7 hrs2.341.7 hrs1.04
NV Energy-----
City of Fallon - (NV)-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Nevada's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 12,212 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Churchill County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Churchill County, NV annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/nevada/churchill-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON