2024 Douglas County, NE Power Outage Report

In 2024, customers in Douglas County, NE went without power for an average of 31.5 hours, a total of 8.3M customer-hours (Nebraska average 12.1 hours). That ranks 2nd worst of 55 Nebraska counties and 313th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
31.5
261,904 customers
Customer-hours out
8.3M
Peak customers out
157,876
Outages ≥1,000 out
71
6 of 10,000+ · 705 total
Longest outage
19d 15h
began April 11, 2024
Rank in state
2nd/55
313th of 2,990 US

Compared with NE, the US and 2023

Douglas County, NE average hours without power per customer compared with state and national averages, 2024Douglas County 31.5 hours, Nebraska average 12.1 hours, US average 12.6 hours, Douglas County, 2023 2.0 hoursDouglas CountyDouglas County31.5hNebraska averageNebraska average12.1hUS averageUS average12.6hDouglas County, 2023Douglas County, 20232.0h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Douglas County, NE customer-hours without power by month, 2024Jan 21K, Feb 10K, Mar 44K, Apr 198K, May 241K, Jun 483K, Jul 130K, Aug 7.0M, Sep 22K, Oct 31K, Nov 28K, Dec 18K02M4M6M8M21KJan10KFeb44KMar198KApr241KMay483KJun130KJul7.0MAug22KSep31KOct28KNov18KDec
Use the arrow keys to read values.
Customer-hours; August was the worst month.

Douglas County year over year

CSVJSON
Douglas County, NE: average hours without power per customer by year2015: 1.3h; 2016: 2.4h; 2017: 3.9h; 2018: 3.9h, coverage 45%; 2019: 1.7h, coverage 46%; 2020: 3.0h, coverage 48%; 2021: 20.0h, coverage 48%; 2022: 1.3h, coverage 48%; 2023: 2.0h; 2024: 31.5h; 2025: 7.4h0102030400%50%100%1.3h20152.4h20163.9h20173.9h20181.7h20193.0h202020.0h20211.3h20222.0h202331.5h20247.4h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Nebraska customers tracked each year.

Biggest outages in Douglas County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1August 1, 2024 01:15August 12, 2024 00:0010d 22h157,8766.9M
2July 31, 2024 12:30August 1, 2024 00:1511h 45m145,477100K
3June 25, 2024 14:00June 29, 2024 08:453d 18h35,720442K
4May 24, 2024 09:15May 29, 2024 08:154d 23h10,56389K
5May 20, 2024 13:30May 24, 2024 00:153d 10h10,47079K
6March 28, 2024 12:45March 29, 2024 06:4518h10,1552,630
7December 18, 2024 15:00December 19, 2024 03:1512h 15m8,4775,436
8April 11, 2024 12:15May 1, 2024 04:0019d 15h8,436191K
9January 13, 2024 21:30January 14, 2024 12:3015h5,07816K
10August 12, 2024 00:45August 13, 2024 04:301d 3h4,87626K

Outage episodes by size in 2024: 153 reached 100+ customers, 71 reached 1,000+ customers, 6 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Douglas County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Omaha Public Power District202419.8 hrs1.6886 min0.66

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Nebraska's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 261,904 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Douglas County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Douglas County, NE annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/nebraska/douglas-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON