massoutage

County annual report · FIPS 17129

2024 Menard County, IL Power Outage Report

In 2024, customers in Menard County, IL went without power for an average of 1.1 hours, a total of 4,554 customer-hours (Illinois average 3.0 hours). That ranks 92nd worst of 102 Illinois counties and 2704th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
1.1
4,167 customers
Customer-hours out
4,554
Peak customers out
1,731
Outages ≥1,000 out
1
0 of 10,000+ · 130 total
Longest outage
13h 15m
began July 16, 2024
Rank in state
92nd/102
2704th of 2,990 US

Compared with IL, the US and 2023

Menard County, IL average hours without power per customer compared with state and national averages, 2024Menard County 1.1 hours, Illinois average 3.0 hours, US average 12.6 hours, Menard County, 2023 2.6 hoursMenard CountyMenard County1.1hIllinois averageIllinois average3.0hUS averageUS average12.6hMenard County, 2023Menard County, 20232.6h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Menard County, IL customer-hours without power by month, 2024Jan 159, Feb 48, Mar 464, Apr 1,832, May 291, Jun 87, Jul 370, Aug 26, Sep 231, Oct 818, Nov 176, Dec 5605001k1.5k2k159Jan48Feb464Mar1,832Apr291May87Jun370Jul26Aug231Sep818Oct176Nov56Dec
Use the arrow keys to read values.
Customer-hours; April was the worst month.

Menard County year over year

CSVJSON
Menard County, IL: average hours without power per customer by year2015: 2.5h; 2016: 2.6h; 2017: 1.5h; 2018: 2.1h, coverage 92%; 2019: 2.9h, coverage 99%; 2020: 1.0h, coverage 94%; 2021: 2.7h, coverage 98%; 2022: 1.4h, coverage 98%; 2023: 2.6h; 2024: 1.1h; 2025: 2.2h01230%50%100%2.5h20152.6h20161.5h20172.1h20182.9h20191.0h20202.7h20211.4h20222.6h20231.1h20242.2h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Illinois customers tracked each year.

Biggest outages in Menard County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1April 17, 2024 13:45April 17, 2024 17:303h 45m1,7311,609
2March 5, 2024 15:45March 5, 2024 17:151h 30m331372
3November 1, 2024 14:45November 1, 2024 15:1530m254127
4October 25, 2024 06:15October 25, 2024 10:003h 45m251749
5May 21, 2024 22:30May 22, 2024 01:303h72157
6April 16, 2024 20:15April 16, 2024 21:151h6666
7July 30, 2024 12:45July 30, 2024 17:304h 45m63161
8January 12, 2024 21:00January 12, 2024 22:151h 15m5164
9April 18, 2024 23:45April 19, 2024 02:302h 45m51140
10October 2, 2024 13:45October 2, 2024 15:151h 30m3940

Outage episodes by size in 2024: 4 reached 100+ customers, 1 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Menard County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Ameren Illinois Company20243.7 hrs1.132.0 hrs0.91
Menard Electric Coop20242.8 hrs1.491.9 hrs1.27
Ameren-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Illinois's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 4,167 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Menard County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Menard County, IL annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/illinois/menard-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON