massoutage

County annual report · FIPS 17129

2023 Menard County, IL Power Outage Report

In 2023, customers in Menard County, IL went without power for an average of 2.6 hours, a total of 11K customer-hours (Illinois average 4.0 hours). That ranks 72nd worst of 102 Illinois counties and 2073rd of 2,977 nationally.

Summary data CSVJSON
Avg hrs / customer
2.6
4,167 customers
Customer-hours out
11K
Peak customers out
2,047
Outages ≥1,000 out
2
0 of 10,000+ · 156 total
Longest outage
2d
began July 15, 2023
Rank in state
72nd/102
2073rd of 2,977 US

Compared with IL, the US and 2022

Menard County, IL average hours without power per customer compared with state and national averages, 2023Menard County 2.6 hours, Illinois average 4.0 hours, US average 7.1 hours, Menard County, 2022 1.4 hoursMenard CountyMenard County2.6hIllinois averageIllinois average4.0hUS averageUS average7.1hMenard County, 2022Menard County, 20221.4h
Use the arrow keys to read values.
Average hours without power per customer in 2023; last bar is this county in 2022.

Month by month

CSVJSON
Menard County, IL customer-hours without power by month, 2023Jan 35, Feb 21, Mar 409, Apr 243, May 271, Jun 4,191, Jul 830, Aug 3,632, Sep 193, Oct 66, Nov 1,002, Dec 8702k4k6k35Jan21Feb409Mar243Apr271May4,191Jun830Jul3,632Aug193Sep66Oct1,002Nov87Dec
Use the arrow keys to read values.
Customer-hours; June was the worst month.

Menard County year over year

CSVJSON
Menard County, IL: average hours without power per customer by year2015: 2.5h; 2016: 2.6h; 2017: 1.5h; 2018: 2.1h, coverage 92%; 2019: 2.9h, coverage 99%; 2020: 1.0h, coverage 94%; 2021: 2.7h, coverage 98%; 2022: 1.4h, coverage 98%; 2023: 2.6h; 2024: 1.1h; 2025: 2.2h01230%50%100%2.5h20152.6h20161.5h20172.1h20182.9h20191.0h20202.7h20211.4h20222.6h20231.1h20242.2h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Illinois customers tracked each year.

Biggest outages in Menard County, 2023

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1August 25, 2023 21:15August 26, 2023 16:0018h 45m2,0472,692
2November 29, 2023 19:45November 29, 2023 22:152h 30m1,154866
3June 29, 2023 17:15July 1, 2023 17:001d 23h7744,268
4August 28, 2023 10:30August 28, 2023 13:152h 45m383788
5March 31, 2023 23:15April 1, 2023 00:151h263263
6March 17, 2023 02:30March 17, 2023 05:303h9189
7March 20, 2023 18:45March 20, 2023 19:451h9124
8September 17, 2023 00:30September 17, 2023 02:452h 15m90101
9August 7, 2023 14:15August 7, 2023 15:301h 15m5164
10July 11, 2023 23:15July 12, 2023 03:304h 15m45191

Outage episodes by size in 2023: 5 reached 100+ customers, 2 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Menard County reported on EIA Form 861 for 2023, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Ameren Illinois Company20239.9 hrs1.331.9 hrs0.82
Menard Electric Coop20237.4 hrs2.471.6 hrs1.46
Ameren-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Illinois's customers in 2023; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 4,167 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Menard County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Menard County, IL annual power outage report, 2023, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2023/illinois/menard-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON