massoutage

County annual report · FIPS 02068

2018 Denali Borough, AK Power Outage Report

In 2018, customers in Denali Borough, AK went without power for an average of 14.5 hours, a total of 15K customer-hours (Alaska average 6.2 hours). That ranks 2nd worst of 7 Alaska counties and 385th of 2,798 nationally.

Summary data CSVJSON
Avg hrs / customer
14.5
1,014 customers
Customer-hours out
15K
Peak customers out
1,358
Outages ≥1,000 out
1
0 of 10,000+ · 76 total
Longest outage
12h 15m
began August 5, 2018
Rank in state
2nd/7
385th of 2,798 US

Compared with AK, the US and 2017

Denali Borough, AK average hours without power per customer compared with state and national averages, 2018Denali Borough 14.5 hours, Alaska average 6.2 hours, US average 5.6 hours, Denali Borough, 2017 4.1 hoursDenali BoroughDenali Borough14.5hAlaska averageAlaska average6.2hUS averageUS average5.6hDenali Borough, 2017Denali Borough, 20174.1h
Use the arrow keys to read values.
Average hours without power per customer in 2018; last bar is this county in 2017.

Month by month

CSVJSON
Denali Borough, AK customer-hours without power by month, 2018Jan 257, Feb 767, Mar 21, Apr 376, May 315, Jun 119, Jul 1,453, Aug 6,554, Sep 11, Oct 951, Nov 148, Dec 3,68602k4k6k8k257Jan767Feb21Mar376Apr315May119Jun1,453Jul6,554Aug11Sep951Oct148Nov3,686Dec
Use the arrow keys to read values.
Customer-hours; August was the worst month.

Denali Borough year over year

CSVJSON
Denali Borough, AK: average hours without power per customer by year2015: no data; 2016: 2.4h; 2017: 4.1h; 2018: 14.5h, coverage 67%; 2019: 18.7h, coverage 67%; 2020: 19.4h, coverage 68%; 2021: 23.2h, coverage 68%; 2022: 25.5h, coverage 71%; 2023: 10.3h; 2024: 17.8h; 2025: 40.8h02040600%50%100%n/a20152.4h20164.1h201714.5h201818.7h201919.4h202023.2h202125.5h202210.3h202317.8h202440.8h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Alaska customers tracked each year.

Biggest outages in Denali Borough, 2018

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1December 22, 2018 02:45December 22, 2018 03:3045m1,358749
2July 1, 2018 16:00July 1, 2018 16:3030m795398
3August 6, 2018 09:30August 6, 2018 14:305h7953,975
4July 26, 2018 22:45July 26, 2018 23:3045m395296
5August 3, 2018 01:30August 3, 2018 02:451h 15m395483
6November 5, 2018 17:15November 5, 2018 17:4530m38697
7December 3, 2018 07:00December 3, 2018 07:4545m382287
8December 15, 2018 18:00December 15, 2018 18:1515m38296
9December 12, 2018 18:00December 12, 2018 18:3030m37995
10December 14, 2018 11:30December 14, 2018 12:0030m378189

Outage episodes by size in 2018: 23 reached 100+ customers, 1 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Denali Borough reported on EIA Form 861 for 2018, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Golden Valley Elec Assn Inc20188.8 hrs6.615.5 hrs5.26

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about 67% of Alaska's customers in 2018; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 1,014 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Denali Borough has data for 2016–2025.

Cite this report

MassOutage (massoutage.com), Denali Borough, AK annual power outage report, 2018, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2018/alaska/denali-borough

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON