massoutage

County annual report · FIPS 38015

2017 Burleigh County, ND Power Outage Report

In 2017, customers in Burleigh County, ND went without power for an average of 0.5 hours, a total of 28K customer-hours (North Dakota average 0.9 hours). That ranks 17th worst of 34 North Dakota counties and 2295th of 2,786 nationally.

Summary data CSVJSON
Avg hrs / customer
0.5
57,076 customers
Customer-hours out
28K
Peak customers out
2,454
Outages ≥1,000 out
3
0 of 10,000+ · 156 total
Longest outage
11d 11h
began April 25, 2017
Rank in state
17th/34
2295th of 2,786 US

Compared with ND, the US

Burleigh County, ND average hours without power per customer compared with state and national averages, 2017Burleigh County 0.5 hours, North Dakota average 0.9 hours, US average 7.4 hoursBurleigh CountyBurleigh County0.5hNorth Dakota averageNorth Dakota average0.9hUS averageUS average7.4h
Use the arrow keys to read values.
Average hours without power per customer in 2017.

Month by month

CSVJSON
Burleigh County, ND customer-hours without power by month, 2017Jan 0, Feb 59, Mar 2,527, Apr 4,848, May 3,632, Jun 3,245, Jul 4,271, Aug 5,673, Sep 1,122, Oct 2,083, Nov 294, Dec 3602k4k6k0Jan59Feb2,527Mar4,848Apr3,632May3,245Jun4,271Jul5,673Aug1,122Sep2,083Oct294Nov36Dec
Use the arrow keys to read values.
Customer-hours; August was the worst month.

Burleigh County year over year

CSVJSON
Burleigh County, ND: average hours without power per customer by year2015: no data; 2016: no data; 2017: 0.5h; 2018: 0.3h, coverage 51%; 2019: 0.2h, coverage 53%; 2020: 0.2h, coverage 66%; 2021: 0.3h, coverage 66%; 2022: 0.3h, coverage 66%; 2023: 0.2h; 2024: 0.2h; 2025: 0.9h00.30.50.810%50%100%n/a2015n/a20160.5h20170.3h20180.2h20190.2h20200.3h20210.3h20220.2h20230.2h20240.9h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of North Dakota customers tracked each year.

Biggest outages in Burleigh County, 2017

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1April 24, 2017 09:00April 25, 2017 08:0023h2,4543,805
2May 18, 2017 08:30May 28, 2017 14:3010d 6h2,3173,146
3July 22, 2017 03:30July 22, 2017 17:1513h 45m1,0781,947
4June 13, 2017 09:45June 13, 2017 14:455h9862,121
5October 21, 2017 17:15October 22, 2017 00:307h 15m581954
6July 21, 2017 03:00July 21, 2017 03:3030m568146
7July 15, 2017 00:15July 15, 2017 01:301h 15m557656
8July 21, 2017 07:15July 21, 2017 07:4530m547139
9July 10, 2017 22:45July 11, 2017 01:002h 15m521509
10June 5, 2017 01:45June 5, 2017 02:3045m467129

Outage episodes by size in 2017: 18 reached 100+ customers, 3 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Burleigh County reported on EIA Form 861 for 2017, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Otter Tail Power Co20172.4 hrs2.122.0 hrs2.00
WAPA-- Western Area Power Administration-----
Montana-Dakota Utilities Co-----
Capital Electric Coop, Inc-----
KEM Electric Coop Inc-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of North Dakota's customers in 2017; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 57,076 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Burleigh County has data for 2017–2025.

Cite this report

MassOutage (massoutage.com), Burleigh County, ND annual power outage report, 2017, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2017/north-dakota/burleigh-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON