massoutage

County annual report · FIPS 38065

2025 Oliver County, ND Power Outage Report

In 2025, customers in Oliver County, ND went without power for an average of 2.2 hours, a total of 2,714 customer-hours (North Dakota average 3.1 hours). That ranks 24th worst of 52 North Dakota counties and 2344th of 3,000 nationally.

Summary data CSVJSON
Avg hrs / customer
2.2
1,231 customers
Customer-hours out
2,714
Peak customers out
371
Outages ≥1,000 out
0
0 of 10,000+ · 7 total
Longest outage
6h 15m
began June 21, 2025
Rank in state
24th/52
2344th of 3,000 US

Compared with ND, the US and 2024

Oliver County, ND average hours without power per customer compared with state and national averages, 2025Oliver County 2.2 hours, North Dakota average 3.1 hours, US average 5.9 hours, Oliver County, 2024 0.5 hoursOliver CountyOliver County2.2hNorth Dakota averageNorth Dakota average3.1hUS averageUS average5.9hOliver County, 2024Oliver County, 20240.5h
Use the arrow keys to read values.
Average hours without power per customer in 2025; last bar is this county in 2024.

Month by month

CSVJSON
Oliver County, ND customer-hours without power by month, 2025Jan 0, Feb 0, Mar 0, Apr 12, May 11, Jun 1,652, Jul 0, Aug 0, Sep 0, Oct 1,038, Nov 0, Dec 005001k1.5k2k0Jan0Feb0Mar12Apr11May1,652Jun0Jul0Aug0Sep1,038Oct0Nov0Dec
Use the arrow keys to read values.
Customer-hours; June was the worst month.

Oliver County year over year

CSVJSON
Oliver County, ND: average hours without power per customer by year2015: no data; 2016: no data; 2017: 0.5h; 2018: 0.4h, coverage 51%; 2019: 0.1h, coverage 53%; 2020: 0.9h, coverage 66%; 2021: 0.1h, coverage 66%; 2022: 0.5h, coverage 66%; 2023: no data; 2024: 0.5h; 2025: 2.2h01230%50%100%n/a2015n/a20160.5h20170.4h20180.1h20190.9h20200.1h20210.5h2022n/a20230.5h20242.2h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of North Dakota customers tracked each year.

Biggest outages in Oliver County, 2025

The 7 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1June 4, 2025 21:15June 4, 2025 21:3015m37193
2June 21, 2025 02:45June 21, 2025 09:006h 15m3691,523
3October 16, 2025 19:15October 16, 2025 22:153h3661,038
4June 4, 2025 16:45June 4, 2025 18:301h 45m914
5April 25, 2025 14:15April 25, 2025 15:451h 30m812
6May 1, 2025 19:00May 1, 2025 21:152h 15m511
7June 21, 2025 20:45June 22, 2025 01:154h 30m523

Outage episodes by size in 2025: 3 reached 100+ customers, 0 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Oliver County reported on EIA Form 861 for 2025, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Montana-Dakota Utilities Co20242.9 hrs1.262.1 hrs1.10
WAPA-- Western Area Power Administration-----
Roughrider Electric Cooperativ-----
Mor-Gran-Sou Electric Coop Inc-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of North Dakota's customers in 2025; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 1,231 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Oliver County has data for 2017–2022, 2024–2025.

Cite this report

MassOutage (massoutage.com), Oliver County, ND annual power outage report, 2025, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2025/north-dakota/oliver-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON