massoutage

County annual report · FIPS 48301

2024 Loving County, TX Power Outage Report

In 2024, customers in Loving County, TX went without power for an average of 38.2 hours, a total of 6,499 customer-hours (Texas average 25.5 hours). That ranks 40th worst of 252 Texas counties and 258th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
38.2
170 customers
Customer-hours out
6,499
Peak customers out
158
Outages ≥1,000 out
0
0 of 10,000+ · 173 total
Longest outage
1d 18h
began December 23, 2024
Rank in state
40th/252
258th of 2,990 US

Compared with TX, the US and 2023

Loving County, TX average hours without power per customer compared with state and national averages, 2024Loving County 38.2 hours, Texas average 25.5 hours, US average 12.6 hours, Loving County, 2023 37.8 hoursLoving CountyLoving County38.2hTexas averageTexas average25.5hUS averageUS average12.6hLoving County, 2023Loving County, 202337.8h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Loving County, TX customer-hours without power by month, 2024Jan 790, Feb 472, Mar 868, Apr 361, May 90, Jun 920, Jul 455, Aug 119, Sep 57, Oct 215, Nov 488, Dec 1,66505001k1.5k2k790Jan472Feb868Mar361Apr90May920Jun455Jul119Aug57Sep215Oct488Nov1,665Dec
Use the arrow keys to read values.
Customer-hours; December was the worst month.

Loving County year over year

CSVJSON
Loving County, TX: average hours without power per customer by year2015: 22.7h; 2016: no data; 2017: 3.3h; 2018: 166.0h, coverage 90%; 2019: 150.1h, coverage 93%; 2020: 80.8h, coverage 63%; 2021: 121.2h, coverage 94%; 2022: 53.6h, coverage 93%; 2023: 37.8h; 2024: 38.2h; 2025: 46.0h0501001502000%50%100%22.7h2015n/a20163.3h2017166.0h2018150.1h201980.8h2020121.2h202153.6h202237.8h202338.2h202446.0h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Texas customers tracked each year.

Biggest outages in Loving County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1December 23, 2024 11:15December 25, 2024 05:151d 18h1581,559
2June 29, 2024 23:45June 30, 2024 09:009h 15m108683
3January 8, 2024 07:45January 8, 2024 22:0014h 15m100445
4January 15, 2024 05:30January 15, 2024 08:303h60180
5February 8, 2024 19:30February 9, 2024 01:456h 15m59344
6March 23, 2024 23:45March 25, 2024 06:451d 7h32661
7March 23, 2024 17:00March 23, 2024 17:1515m318
8April 13, 2024 12:45April 13, 2024 22:4510h31227
9November 18, 2024 01:45November 19, 2024 13:151d 11h30423
10December 25, 2024 07:15December 25, 2024 10:002h 45m3018

Outage episodes by size in 2024: 3 reached 100+ customers, 0 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Loving County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Oncor Electric Delivery Company LLC20173.4 hrs1.692.4 hrs1.49

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Texas's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 170 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Loving County has data for 2015, 2017–2025.

Cite this report

MassOutage (massoutage.com), Loving County, TX annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/texas/loving-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON