massoutage

County annual report · FIPS 48043

2024 Brewster County, TX Power Outage Report

In 2024, customers in Brewster County, TX went without power for an average of 914.5 hours, a total of 203K customer-hours (Texas average 25.5 hours). That ranks 4th worst of 252 Texas counties and 9th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
914.5
222 customers
Customer-hours out
203K
Peak customers out
2,467
Outages ≥1,000 out
1
0 of 10,000+ · 22 total
Longest outage
210d 21h
began May 24, 2024
Rank in state
4th/252
9th of 2,990 US

Compared with TX, the US and 2023

Brewster County, TX average hours without power per customer compared with state and national averages, 2024Brewster County 914.5 hours, Texas average 25.5 hours, US average 12.6 hours, Brewster County, 2023 67.3 hoursBrewster CountyBrewster County914.5hTexas averageTexas average25.5hUS averageUS average12.6hBrewster County, 2023Brewster County, 202367.3h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Brewster County, TX customer-hours without power by month, 2024Jan 634, Feb 8,029, Mar 11K, Apr 15K, May 7,718, Jun 36K, Jul 27K, Aug 55K, Sep 17K, Oct 14K, Nov 6,831, Dec 4,797020k40k60k634Jan8,029Feb11KMar15KApr7,718May36KJun27KJul55KAug17KSep14KOct6,831Nov4,797Dec
Use the arrow keys to read values.
Customer-hours; August was the worst month.

Brewster County year over year

CSVJSON
Brewster County, TX: average hours without power per customer by year2015: 383.1h; 2016: no data; 2017: 1.0h; 2018: 456.7h, coverage 90%; 2019: 228.6h, coverage 93%; 2020: 86.6h, coverage 63%; 2021: 888.9h, coverage 94%; 2022: 87.6h, coverage 93%; 2023: 67.3h; 2024: 914.5h; 2025: 649.2h02505007501k0%50%100%383.1h2015n/a20161.0h2017456.7h2018228.6h201986.6h2020888.9h202187.6h202267.3h2023914.5h2024649.2h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Texas customers tracked each year.

Biggest outages in Brewster County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1May 24, 2024 09:15December 21, 2024 06:45210d 21h2,467162K
2February 1, 2024 17:45April 3, 2024 22:4562d 5h93120K
3April 6, 2024 06:30May 24, 2024 00:1547d 17h81315K
4April 3, 2024 23:30April 6, 2024 05:302d 6h7543,832
5January 8, 2024 20:30January 9, 2024 02:456h 15m106359
6December 21, 2024 07:45January 1, 2025 00:0010d 16h761,240
7January 12, 2024 06:45January 12, 2024 08:301h 45m65114
8January 22, 2024 10:45January 22, 2024 12:151h 30m1825
9January 10, 2024 16:00January 10, 2024 22:006h733
10January 23, 2024 22:15January 24, 2024 01:153h515

Outage episodes by size in 2024: 5 reached 100+ customers, 1 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Brewster County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
AEP Texas North Company20241.8 hrs1.151.7 hrs1.13
Rio Grande Electric Coop, Inc20245.5 hrs-3.9 hrs-

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Texas's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 222 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Brewster County has data for 2015, 2017–2025.

Cite this report

MassOutage (massoutage.com), Brewster County, TX annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/texas/brewster-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON