massoutage

County annual report · FIPS 29073

2024 Gasconade County, MO Power Outage Report

In 2024, customers in Gasconade County, MO went without power for an average of 5.2 hours, a total of 35K customer-hours (Missouri average 5.8 hours). That ranks 64th worst of 114 Missouri counties and 1564th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
5.2
6,636 customers
Customer-hours out
35K
Peak customers out
955
Outages ≥1,000 out
0
0 of 10,000+ · 458 total
Longest outage
1d 14h
began May 8, 2024
Rank in state
64th/114
1564th of 2,990 US

Compared with MO, the US and 2023

Gasconade County, MO average hours without power per customer compared with state and national averages, 2024Gasconade County 5.2 hours, Missouri average 5.8 hours, US average 12.6 hours, Gasconade County, 2023 6.5 hoursGasconade CountyGasconade County5.2hMissouri averageMissouri average5.8hUS averageUS average12.6hGasconade County, 2023Gasconade County, 20…6.5h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Gasconade County, MO customer-hours without power by month, 2024Jan 693, Feb 210, Mar 1,973, Apr 3,484, May 12K, Jun 1,341, Jul 2,334, Aug 1,758, Sep 2,196, Oct 2,600, Nov 4,742, Dec 1,06105k10k15k693Jan210Feb1,973Mar3,484Apr12KMay1,341Jun2,334Jul1,758Aug2,196Sep2,600Oct4,742Nov1,061Dec
Use the arrow keys to read values.
Customer-hours; May was the worst month.

Gasconade County year over year

CSVJSON
Gasconade County, MO: average hours without power per customer by year2015: 3.7h; 2016: 1.3h; 2017: 3.7h; 2018: 2.4h, coverage 80%; 2019: 7.1h, coverage 95%; 2020: 2.9h, coverage 95%; 2021: 3.3h, coverage 95%; 2022: 2.6h, coverage 95%; 2023: 6.5h; 2024: 5.2h; 2025: 3.0h024680%50%100%3.7h20151.3h20163.7h20172.4h20187.1h20192.9h20203.3h20212.6h20226.5h20235.2h20243.0h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Missouri customers tracked each year.

Biggest outages in Gasconade County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1September 23, 2024 22:15September 24, 2024 00:152h9551,671
2May 8, 2024 16:00May 10, 2024 06:451d 14h6378,295
3November 19, 2024 03:15November 19, 2024 09:456h 30m5722,408
4April 2, 2024 01:00April 2, 2024 13:0012h3801,641
5August 20, 2024 12:00August 20, 2024 14:002h371378
6July 12, 2024 19:30July 12, 2024 21:001h 30m340510
7October 31, 2024 06:45October 31, 2024 13:306h 45m3391,996
8March 14, 2024 11:45March 14, 2024 16:304h 45m3251,060
9April 29, 2024 12:30April 29, 2024 16:003h 30m201654
10May 26, 2024 08:15May 26, 2024 14:156h155580

Outage episodes by size in 2024: 21 reached 100+ customers, 0 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Gasconade County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Union Electric Co - (MO)20242.5 hrs0.771.6 hrs0.67
Intercounty Electric Coop Assn - (MO)20244.5 hrs1.723.0 hrs1.45
Crawford Electric Coop, Inc20245.9 hrs2.134.5 hrs1.94
Three Rivers Electric Coop20242.3 hrs0.982.3 hrs0.98
Ameren-----
City of Hermann-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Missouri's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 6,636 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Gasconade County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Gasconade County, MO annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/missouri/gasconade-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON