massoutage

County annual report · FIPS 26039

2024 Crawford County, MI Power Outage Report

In 2024, customers in Crawford County, MI went without power for an average of 6.8 hours, a total of 56K customer-hours (Michigan average 8.5 hours). That ranks 43rd worst of 83 Michigan counties and 1278th of 2,990 nationally.

Summary data CSVJSON
Avg hrs / customer
6.8
8,218 customers
Customer-hours out
56K
Peak customers out
2,090
Outages ≥1,000 out
2
0 of 10,000+ · 402 total
Longest outage
2d 4h
began April 2, 2024
Rank in state
43rd/83
1278th of 2,990 US

Compared with MI, the US and 2023

Crawford County, MI average hours without power per customer compared with state and national averages, 2024Crawford County 6.8 hours, Michigan average 8.5 hours, US average 12.6 hours, Crawford County, 2023 15.5 hoursCrawford CountyCrawford County6.8hMichigan averageMichigan average8.5hUS averageUS average12.6hCrawford County, 2023Crawford County, 202315.5h
Use the arrow keys to read values.
Average hours without power per customer in 2024; last bar is this county in 2023.

Month by month

CSVJSON
Crawford County, MI customer-hours without power by month, 2024Jan 2,305, Feb 3,939, Mar 1,184, Apr 24K, May 1,866, Jun 6,156, Jul 6,682, Aug 2,924, Sep 628, Oct 1,330, Nov 2,932, Dec 2,179010k20k30k2,305Jan3,939Feb1,184Mar24KApr1,866May6,156Jun6,682Jul2,924Aug628Sep1,330Oct2,932Nov2,179Dec
Use the arrow keys to read values.
Customer-hours; April was the worst month.

Crawford County year over year

CSVJSON
Crawford County, MI: average hours without power per customer by year2015: 57.0h; 2016: 1.8h; 2017: 19.1h; 2018: 4.9h, coverage 91%; 2019: 12.6h, coverage 96%; 2020: 14.0h, coverage 95%; 2021: 34.8h, coverage 95%; 2022: 25.2h, coverage 96%; 2023: 15.5h; 2024: 6.8h; 2025: 162.7h0501001502000%50%100%57.0h20151.8h201619.1h20174.9h201812.6h201914.0h202034.8h202125.2h202215.5h20236.8h2024162.7h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Michigan customers tracked each year.

Biggest outages in Crawford County, 2024

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1July 24, 2024 17:45July 24, 2024 23:456h2,0904,810
2April 2, 2024 17:00April 4, 2024 21:152d 4h1,44115K
3April 12, 2024 12:15April 13, 2024 16:301d 4h9055,142
4August 5, 2024 15:15August 5, 2024 17:001h 45m782202
5June 19, 2024 01:00June 19, 2024 12:3011h 30m7812,855
6May 28, 2024 19:00May 28, 2024 20:151h 15m609610
7April 23, 2024 20:30April 23, 2024 23:152h 45m6081,525
8July 3, 2024 06:00July 3, 2024 08:152h 15m6081,078
9February 28, 2024 08:00February 29, 2024 18:301d 10h5753,075
10April 26, 2024 23:30April 27, 2024 02:002h 30m396990

Outage episodes by size in 2024: 33 reached 100+ customers, 2 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Crawford County reported on EIA Form 861 for 2024, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Consumers Energy Co - (MI)20248.4 hrs1.322.6 hrs0.88
Great Lakes Energy Coop20248.1 hrs2.834.3 hrs2.35
Wolverine Power Supply Coop-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Michigan's customers in 2024; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 8,218 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Crawford County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Crawford County, MI annual power outage report, 2024, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2024/michigan/crawford-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON