massoutage

County annual report · FIPS 29131

2021 Miller County, MO Power Outage Report

In 2021, customers in Miller County, MO went without power for an average of 3.0 hours, a total of 38K customer-hours (Missouri average 4.5 hours). That ranks 65th worst of 115 Missouri counties and 1835th of 2,974 nationally.

Summary data CSVJSON
Avg hrs / customer
3.0
12,538 customers
Customer-hours out
38K
Peak customers out
1,892
Outages ≥1,000 out
5
0 of 10,000+ · 376 total
Longest outage
5d 20h
began June 22, 2021
Rank in state
65th/115
1835th of 2,974 US

Compared with MO, the US and 2020

Miller County, MO average hours without power per customer compared with state and national averages, 2021Miller County 3.0 hours, Missouri average 4.5 hours, US average 8.9 hours, Miller County, 2020 2.0 hoursMiller CountyMiller County3.0hMissouri averageMissouri average4.5hUS averageUS average8.9hMiller County, 2020Miller County, 20202.0h
Use the arrow keys to read values.
Average hours without power per customer in 2021; last bar is this county in 2020.

Month by month

CSVJSON
Miller County, MO customer-hours without power by month, 2021Jan 7,857, Feb 7,611, Mar 2,095, Apr 1,964, May 1,655, Jun 1,045, Jul 547, Aug 740, Sep 4,832, Oct 1,304, Nov 583, Dec 7,58502k4k6k8k7,857Jan7,611Feb2,095Mar1,964Apr1,655May1,045Jun547Jul740Aug4,832Sep1,304Oct583Nov7,585Dec
Use the arrow keys to read values.
Customer-hours; January was the worst month.

Miller County year over year

CSVJSON
Miller County, MO: average hours without power per customer by year2015: 0.5h; 2016: 1.0h; 2017: 1.9h; 2018: 1.8h, coverage 80%; 2019: 13.4h, coverage 95%; 2020: 2.0h, coverage 95%; 2021: 3.0h, coverage 95%; 2022: 3.1h, coverage 95%; 2023: 6.2h; 2024: 2.2h; 2025: 4.8h0510150%50%100%0.5h20151.0h20161.9h20171.8h201813.4h20192.0h20203.0h20213.1h20226.2h20232.2h20244.8h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Missouri customers tracked each year.

Biggest outages in Miller County, 2021

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1September 6, 2021 21:15September 7, 2021 02:455h 30m1,8924,150
2January 1, 2021 09:00January 2, 2021 01:4516h 45m1,8837,131
3December 11, 2021 00:15December 11, 2021 21:3021h 15m1,1096,271
4February 15, 2021 15:15February 15, 2021 22:307h 15m1,0873,552
5April 12, 2021 02:30April 12, 2021 12:159h 45m1,0831,497
6February 27, 2021 14:30February 27, 2021 21:156h 45m5613,059
7December 10, 2021 15:45December 10, 2021 17:001h 15m531134
8March 14, 2021 20:30March 15, 2021 02:306h4861,843
9May 29, 2021 00:15May 29, 2021 06:306h 15m4531,196
10December 9, 2021 21:00December 9, 2021 21:4545m434326

Outage episodes by size in 2021: 19 reached 100+ customers, 5 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Miller County reported on EIA Form 861 for 2021, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Union Electric Co - (MO)20214.9 hrs1.021.5 hrs0.69
Co-Mo Electric Coop Inc20211.9 hrs0.8867 min0.63
Three Rivers Electric Coop20211.6 hrs0.7271 min0.65
Ameren-----
Gascosage Electric Coop-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about 95% of Missouri's customers in 2021; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 12,538 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Miller County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Miller County, MO annual power outage report, 2021, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2021/missouri/miller-county