massoutage

County annual report · FIPS 37169

2020 Stokes County, NC Power Outage Report

In 2020, customers in Stokes County, NC went without power for an average of 103.1 hours, a total of 644K customer-hours (North Carolina average 20.3 hours). That ranks 9th worst of 94 North Carolina counties and 62nd of 3,019 nationally.

Summary data CSVJSON
Avg hrs / customer
103.1
6,242 customers
Customer-hours out
644K
Peak customers out
13,632
Outages ≥1,000 out
6
1 of 10,000+ · 519 total
Longest outage
4d 11h
began October 29, 2020
Rank in state
9th/94
62nd of 3,019 US

Compared with NC, the US and 2019

Stokes County, NC average hours without power per customer compared with state and national averages, 2020Stokes County 103.1 hours, North Carolina average 20.3 hours, US average 8.7 hours, Stokes County, 2019 62.3 hoursStokes CountyStokes County103.1hNorth Carolina averageNorth Carolina avera…20.3hUS averageUS average8.7hStokes County, 2019Stokes County, 201962.3h
Use the arrow keys to read values.
Average hours without power per customer in 2020; last bar is this county in 2019.

Month by month

CSVJSON
Stokes County, NC customer-hours without power by month, 2020Jan 34K, Feb 7,235, Mar 786, Apr 10K, May 6,268, Jun 2,988, Jul 7,284, Aug 8,136, Sep 3,064, Oct 490K, Nov 62K, Dec 12K0200k400k600k34KJan7,235Feb786Mar10KApr6,268May2,988Jun7,284Jul8,136Aug3,064Sep490KOct62KNov12KDec
Use the arrow keys to read values.
Customer-hours; October was the worst month.

Stokes County year over year

CSVJSON
Stokes County, NC: average hours without power per customer by year2015: 13.5h; 2016: 18.2h; 2017: 16.9h; 2018: 81.6h, coverage 82%; 2019: 62.3h, coverage 90%; 2020: 103.1h, coverage 91%; 2021: 22.9h, coverage 92%; 2022: 61.6h, coverage 92%; 2023: 11.4h; 2024: 25.2h; 2025: 23.0h0501001500%50%100%13.5h201518.2h201616.9h201781.6h201862.3h2019103.1h202022.9h202161.6h202211.4h202325.2h202423.0h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of North Carolina customers tracked each year.

Biggest outages in Stokes County, 2020

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1October 29, 2020 13:30November 3, 2020 00:304d 11h13,632532K
2January 11, 2020 22:45January 13, 2020 07:001d 8h2,86333K
3February 7, 2020 09:45February 10, 2020 12:453d 3h1,7405,883
4August 7, 2020 17:00August 7, 2020 19:152h 15m1,551477
5December 29, 2020 06:00December 29, 2020 12:156h 15m1,5436,562
6August 11, 2020 13:45August 11, 2020 16:002h 15m1,1661,472
7September 17, 2020 19:00September 18, 2020 07:1512h 15m976677
8November 11, 2020 23:15November 13, 2020 00:001d93210K
9February 6, 2020 15:45February 6, 2020 19:303h 45m768963
10April 29, 2020 19:45April 29, 2020 20:0015m768192

Outage episodes by size in 2020: 60 reached 100+ customers, 6 reached 1,000+ customers, 1 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Stokes County reported on EIA Form 861 for 2020, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Duke Energy Carolinas, LLC202011.2 hrs1.713.1 hrs1.18
EnergyUnited Elec Member Corp202010.0 hrs1.792.2 hrs1.14
Surry-Yadkin Elec Member Corp20207.0 hrs2.002.6 hrs1.40
Duke Energy-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about 91% of North Carolina's customers in 2020; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 6,242 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Stokes County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Stokes County, NC annual power outage report, 2020, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2020/north-carolina/stokes-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON