massoutage

County annual report · FIPS 35047

2017 San Miguel County, NM Power Outage Report

In 2017, customers in San Miguel County, NM went without power for an average of 1.4 hours, a total of 17K customer-hours (New Mexico average 2.2 hours). That ranks 14th worst of 23 New Mexico counties and 1857th of 2,786 nationally.

Summary data CSVJSON
Avg hrs / customer
1.4
11,786 customers
Customer-hours out
17K
Peak customers out
2,368
Outages ≥1,000 out
5
0 of 10,000+ · 160 total
Longest outage
7h
began October 5, 2017
Rank in state
14th/23
1857th of 2,786 US

Compared with NM, the US and 2016

San Miguel County, NM average hours without power per customer compared with state and national averages, 2017San Miguel County 1.4 hours, New Mexico average 2.2 hours, US average 7.4 hours, San Miguel County, 2016 1.3 hoursSan Miguel CountySan Miguel County1.4hNew Mexico averageNew Mexico average2.2hUS averageUS average7.4hSan Miguel County, 2016San Miguel County, 2…1.3h
Use the arrow keys to read values.
Average hours without power per customer in 2017; last bar is this county in 2016.

Month by month

CSVJSON
San Miguel County, NM customer-hours without power by month, 2017Jan 46, Feb 98, Mar 82, Apr 135, May 32, Jun 2,121, Jul 178, Aug 948, Sep 5,389, Oct 7,547, Nov 32, Dec 1802k4k6k8k46Jan98Feb82Mar135Apr32May2,121Jun178Jul948Aug5,389Sep7,547Oct32Nov18Dec
Use the arrow keys to read values.
Customer-hours; October was the worst month.

San Miguel County year over year

CSVJSON
San Miguel County, NM: average hours without power per customer by year2015: 0.8h; 2016: 1.3h; 2017: 1.4h; 2018: 1.6h, coverage 74%; 2019: 5.8h, coverage 81%; 2020: 1.4h, coverage 82%; 2021: 3.6h, coverage 82%; 2022: 1.8h, coverage 82%; 2023: 4.2h; 2024: 6.9h; 2025: 4.6h024680%50%100%0.8h20151.3h20161.4h20171.6h20185.8h20191.4h20203.6h20211.8h20224.2h20236.9h20244.6h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of New Mexico customers tracked each year.

Biggest outages in San Miguel County, 2017

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1October 1, 2017 17:45October 2, 2017 00:156h 30m2,3686,605
2October 2, 2017 01:00October 2, 2017 01:1515m2,367592
3September 15, 2017 03:15September 15, 2017 07:154h2,3635,317
4August 14, 2017 22:15August 14, 2017 22:3015m2,359590
5June 15, 2017 21:30June 16, 2017 01:304h1,9732,051
6August 9, 2017 22:00August 9, 2017 23:451h 45m306168
7August 6, 2017 21:00August 7, 2017 00:303h 30m10796
8October 18, 2017 13:45October 18, 2017 14:451h101101
9June 8, 2017 18:30June 8, 2017 18:4515m6917
10March 24, 2017 15:30March 24, 2017 16:451h 15m5643

Outage episodes by size in 2017: 8 reached 100+ customers, 5 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving San Miguel County reported on EIA Form 861 for 2017, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Public Service Co of NM20171.6 hrs1.1687 min0.88
Mora-San Miguel Elec Coop20174.3 hrs-3.0 hrs-
Central New Mexico El Coop, Inc-----
Farmers Electric Coop, Inc - (NM)-----
Springer Electric Coop, Inc-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of New Mexico's customers in 2017; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 11,786 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. San Miguel County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), San Miguel County, NM annual power outage report, 2017, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2017/new-mexico/san-miguel-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON