massoutage

County annual report · FIPS 13201

2025 Miller County, GA Power Outage Report

In 2025, customers in Miller County, GA went without power for an average of 1.8 hours, a total of 5,757 customer-hours (Georgia average 4.6 hours). That ranks 139th worst of 159 Georgia counties and 2501st of 3,000 nationally.

Summary data CSVJSON
Avg hrs / customer
1.8
3,209 customers
Customer-hours out
5,757
Peak customers out
620
Outages ≥1,000 out
0
0 of 10,000+ · 119 total
Longest outage
3d 7h
began July 30, 2025
Rank in state
139th/159
2501st of 3,000 US

Compared with GA, the US and 2024

Miller County, GA average hours without power per customer compared with state and national averages, 2025Miller County 1.8 hours, Georgia average 4.6 hours, US average 5.9 hours, Miller County, 2024 5.5 hoursMiller CountyMiller County1.8hGeorgia averageGeorgia average4.6hUS averageUS average5.9hMiller County, 2024Miller County, 20245.5h
Use the arrow keys to read values.
Average hours without power per customer in 2025; last bar is this county in 2024.

Month by month

CSVJSON
Miller County, GA customer-hours without power by month, 2025Jan 82, Feb 71, Mar 1,163, Apr 150, May 987, Jun 1,090, Jul 151, Aug 260, Sep 66, Oct 210, Nov 1,450, Dec 7805001k1.5k82Jan71Feb1,163Mar150Apr987May1,090Jun151Jul260Aug66Sep210Oct1,450Nov78Dec
Use the arrow keys to read values.
Customer-hours; November was the worst month.

Miller County year over year

CSVJSON
Miller County, GA: average hours without power per customer by year2015: 1.5h; 2016: 1.1h; 2017: 3.1h; 2018: 47.1h, coverage 90%; 2019: 1.4h, coverage 86%; 2020: 1.0h, coverage 88%; 2021: 2.8h, coverage 90%; 2022: 1.4h, coverage 91%; 2023: 3.6h; 2024: 5.5h; 2025: 1.8h02040600%50%100%1.5h20151.1h20163.1h201747.1h20181.4h20191.0h20202.8h20211.4h20223.6h20235.5h20241.8h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Georgia customers tracked each year.

Biggest outages in Miller County, 2025

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1November 17, 2025 05:45November 17, 2025 08:002h 15m620584
2June 26, 2025 00:30June 26, 2025 06:306h618700
3May 14, 2025 13:45May 14, 2025 16:152h 30m609461
4May 5, 2025 13:30May 5, 2025 20:156h 45m590237
5March 5, 2025 14:45March 5, 2025 18:303h 45m5331,085
6November 11, 2025 00:15November 11, 2025 03:153h387618
7June 19, 2025 16:45June 19, 2025 21:154h 30m275357
8March 21, 2025 00:15March 21, 2025 02:302h 15m4358
9August 2, 2025 23:45August 3, 2025 05:005h 15m38103
10May 15, 2025 04:00May 15, 2025 06:002h3535

Outage episodes by size in 2025: 7 reached 100+ customers, 0 reached 1,000+ customers, 0 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Miller County reported on EIA Form 861 for 2025, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Georgia Power Co202425.3 hrs2.072.1 hrs1.02
Mitchell Electric Member Corp-----
Three Notch Elec Member Corp-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Georgia's customers in 2025; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 3,209 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Miller County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Miller County, GA annual power outage report, 2025, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2025/georgia/miller-county

summary CSVJSONyears CSVJSONmonths CSVJSONevents CSVJSONutilities CSVJSON