2015 Washoe County, NV Power Outage Report

In 2015, customers in Washoe County, NV went without power for an average of 2.6 hours, a total of 633K customer-hours (Nevada average 1.0 hours). That ranks 6th worst of 15 Nevada counties and 1030th of 2,484 nationally.

Summary data CSVJSON
Avg hrs / customer
2.6
244,311 customers
Customer-hours out
633K
Peak customers out
35,926
Outages ≥1,000 out
22
3 of 10,000+ · 449 total
Longest outage
4d 21h
began June 29, 2015
Rank in state
6th/15
1030th of 2,484 US

Compared with NV, the US

Washoe County, NV average hours without power per customer compared with state and national averages, 2015Washoe County 2.6 hours, Nevada average 1.0 hours, US average 2.9 hoursWashoe CountyWashoe County2.6hNevada averageNevada average1.0hUS averageUS average2.9h
Use the arrow keys to read values.
Average hours without power per customer in 2015.

Month by month

CSVJSON
Washoe County, NV customer-hours without power by month, 2015Jan 0, Feb 0, Mar 0, Apr 0, May 0, Jun 34K, Jul 58K, Aug 39K, Sep 11K, Oct 23K, Nov 442K, Dec 26K0200k400k600k0Jan0Feb0Mar0Apr0May34KJun58KJul39KAug11KSep23KOct442KNov26KDec
Use the arrow keys to read values.
Customer-hours; November was the worst month.

Washoe County year over year

CSVJSON
Washoe County, NV: average hours without power per customer by year2015: 2.6h; 2016: 2.1h; 2017: 3.3h; 2018: 2.0h, coverage 95%; 2019: 2.9h, coverage 95%; 2020: 2.0h, coverage 96%; 2021: 1.8h, coverage 97%; 2022: 3.0h, coverage 97%; 2023: 6.6h; 2024: 7.2h; 2025: 8.9h02.557.5100%50%100%2.6h20152.1h20163.3h20172.0h20182.9h20192.0h20201.8h20213.0h20226.6h20237.2h20248.9h2025
Use the arrow keys to read values.
Average hours without power per customer. Line: EAGLE-I coverage, share of customers tracked (right axis).

Coverage line is EAGLE-I's share of Nevada customers tracked each year.

Biggest outages in Washoe County, 2015

The 10 outage episodes with the most customers out at once. Times are UTC.

CSVJSON
#Started (UTC)Ended (UTC)DurationPeak outCustomer-hours
1November 9, 2015 17:15November 13, 2015 09:153d 16h35,926406K
2August 11, 2015 16:45August 12, 2015 09:3016h 45m12,0526,019
3July 7, 2015 03:15July 10, 2015 06:153d 3h10,60131K
4June 27, 2015 21:00June 29, 2015 06:001d 9h8,86622K
5August 8, 2015 16:15August 8, 2015 21:155h7,2294,347
6June 22, 2015 15:00June 27, 2015 00:454d 9h6,5725,381
7December 3, 2015 17:30December 5, 2015 06:001d 12h5,63412K
8November 24, 2015 15:00November 25, 2015 07:3016h 30m5,1105,923
9November 1, 2015 11:15November 4, 2015 07:452d 20h5,06418K
10July 30, 2015 14:30July 31, 2015 01:4511h 15m4,8761,376

Outage episodes by size in 2015: 89 reached 100+ customers, 22 reached 1,000+ customers, 3 reached 10,000+ customers.

Utility reliability filed with the EIA

SAIDI (average outage time per customer) and SAIFI (average interruptions per customer) that utilities serving Washoe County reported on EIA Form 861 for 2015, or their most recent earlier filing. Utility-wide figures, not county-specific.

CSVJSON
UtilityEIA yearSAIDISAIFISAIDI excl. major eventsSAIFI excl. major events
Sierra Pacific Power Co20154.6 hrs1.461.9 hrs1.02
NV Energy-----
Plumas-Sierra Rural Elec Coop-----
Surprise Valley Electrification-----

About this data

  • Outage figures come from DOE/ORNL EAGLE-I, which records customers out by county every 15 minutes. EAGLE-I tracked about n/a of Nevada's customers in 2015; utilities it does not see are not counted.
  • Hours per customer = outage customer-minutes ÷ 244,311 customers (ORNL modeled county customer count), including major storm days. It is comparable across counties but is not the SAIDI a utility files.
  • An outage event is a continuous stretch with customers out; counts at 100, 1,000 and 10,000+ use its peak.
  • Years loaded: 2015–2025. Washoe County has data for 2015–2025.

Cite this report

MassOutage (massoutage.com), Washoe County, NV annual power outage report, 2015, data as of Oct 3, 2026 02:41 UTC, sources: DOE EAGLE-I (https://eagle-i.doe.gov/); EAGLE-I modeled customer counts (MCC) (https://figshare.com/); EIA Form 861 (utility reliability) (https://www.eia.gov/electricity/data/eia861/). https://massoutage.com/reports/2015/nevada/washoe-county